Check out our successful Drainage Design Project Checklist!
The guide explains what information you need to collect to understand the needs of the area to be drained and to choose the best drainage solution. It covers eight key areas, including the type of industry, technology used, liquid quantity and quality, floor integration, traffic, and cleaning. The sample questions at the end of each section that can help you plan the drainage projects in the best way.
Installation
- Assembly:
ACO products are designed to minimise assembly time and related costs as well as ease commissioning post installation.
- Installation support on site:
ACO team can be on-hand throughout the installation of your drainage system to provide guidance and best practice advice.
- Welding on site:
New, recently introduced connection method enables installers to hygienically weld together long sections of drainage channel on site and is perfect for use in hygienically sensitive environments.